Ximu Electric
西东无问 南北有亩
Pain points: Large fluctuations in electricity load, frequent overloading of transformers, inability to shut down critical equipment, and high investment in new energy grid connection renovation.
Implementation configuration:Back to back flexible DC topology equipment+bidirectional ACDC converter+microgrid control system, achieving load balancing and fault load transfer in the substation area.
.Solution value:Flexible allocation of power consumption in various areas, emergency supply guarantee in case of power outage, and creating a zero carbon demonstration project in the transportation sector..